1、Canada Waterbottle Project

Capacity Scale: 10MW/69MWh

Composition: 24 sets of 20-foot containers

Location: California, USA

Application Scenarios: UPS Emergency Power Supply

Commissioning Time: 2023

2、The USA Texas Project

▶ The TX10 project in Texas, USA, is located in Houston and comprises 9 stations, with a capacity of 10MW/11MWH each

▶ Provide frequency regulation and demand-shifting services for community substations

▶ The project was contracted at the end of 2019, with the initial six sites being grid-connected in early 2021. The remaining three sites were grid-connected by the end of 2021. CLOU supplied DC-side energy storage systems for these sites

3、Canada Waterbottle Project

Capacity Scale: 10MW/69MWh

Composition: 24 sets of 20-foot containers

Location: California, USA

Application Scenarios: UPS Emergency Power Supply

Commissioning Time: 2023

4、The Lafayette Project

Project Size: 1MW/2.45MWh

Building Location: Beijing, China

Application Scenarios: Industrial & commercial user

Commissioning Time: June, 2017

Considering the system’s discharge depth and conversion efficiency, the energy storage power station is housed within a 45-foot standard container (each unit measures 13716mm in length, 2438mm in width, and 2896mm in height). The container is equipped with two 500kW energy storage bidirectional converters and 16 sets of 175.104kWh lithium iron phosphate battery racks from CLOU